Skip to main content
All industries

Heavy Vehicle / NHVR Compliance

A dispatch change needs to reach everyone responsible.

A transport task can change between dispatch and delivery. People need to see which plan is current, what checks were made and who acknowledged a change. The applicable heavy vehicle law depends on where the task operates.

A working example / Transport & Logistics

The dispatch plan has to stay current.

An illustrative design question based on this kind of work. This is not a client project, delivered product or claim that every organisation follows this process.

Illustrative comparison

Dispatch revision

Example ref / RUN-063

What changed or needs checking

  1. 01
    Original plan

    Load, vehicle, driver and route at dispatch.

  2. 02
    Change

    What has changed and who requested it.

  3. 03
    Checks

    Vehicle, driver, route and required controls reviewed.

  4. 04
    Acknowledgement

    Driver receives and confirms the current plan.

Decision to make

Can the revised plan be sent to the driver?

Record to keep

Everyone works from the current version, with the change history retained.

Discovery notes

What has to be checked in the real operation.

The example above frames a design question. These conditions need to be checked with the organisation and its advisers before scope or software behaviour is decided.

  • 01

    The HVNL has not commenced in Western Australia or the Northern Territory, but it can apply when vehicles from those jurisdictions travel into a participating jurisdiction.

  • 02

    Chain of responsibility duties extend beyond the driver to other parties in the transport task, with the applicable duty depending on their role and influence.

  • 03

    Fatigue management accreditation (Basic or Advanced Fatigue Management) requires ongoing documentation and demonstrated compliance with accreditation conditions.

  • 04

    Relevant vehicle, load and permit information should be available to the people checking a task and responding to an inspection.

Keep dispatch changes in one current plan.

Examples to investigate, not off-the-shelf products or a claim that an integration is available.

Chain of responsibility registers

Duty documentation for each supply chain party: operator, scheduler, consignor, consignee, packer, and loader.

Fatigue management records

Work and rest record systems aligned to Standard, Basic, and Advanced Fatigue Management schemes.

Mass & dimension tracking

Permit condition tracking for over-mass and over-dimension loads with expiry and route alerts.

Maintenance scheduling

Preventive maintenance linked to odometer or engine hours, with defect and roadworthiness records.

Published obligations to check

Rules and timeframes for Transport & Logistics work.

NHVR

Heavy Vehicle National Law

Checked against nhvr.gov.au on 04/10/2026.

RefObligationFigure
Ref 5.1: Jurisdictions where the HVNL has commencedACT, NSW, Qld, SA, Tas, Vic
Ref 5.2: WA and NT vehicles entering a participating jurisdictionHVNL can apply after crossing

Bring us the sticking point.

Tell us how this work runs in your organisation. We can assess whether a software project makes sense, with the real rules and existing tools in view.

Send an enquiry